A driveway is the largest slab most houses ever get and the one that carries real loads. What decides its life is the base it sits on and where the joints go.

Licensed & insuredFree written estimatesFrederick-based crewClean-site guarantee

Quick answer

How much does a concrete driveway cost in Frederick, MD?

Concrete driveways in this area generally run $8 to $18 per square foot installed, so a typical 600 square foot two-car drive lands between $5,400 and $13,800. Our clay subsoils commonly add another $2 to $5 per square foot in base preparation, and demolition of an existing slab is $3 to $8 per square foot on top. Those are 2026 ranges. A walkthrough replaces them with a number, and we would rather show the clay cost separately than hide it in the rate.

The work

What concrete driveway actually involves.

The cheapest concrete driveway quote in any county is usually cheapest for a reason you cannot see from the finished surface. Concrete is sold by the yard and placed by the hour, so there are only a few places to save money: thinner slab, less reinforcement, and above all less excavation and base. All three are invisible on the day the forms come off and all three show up in the same place — the third winter.

The base question is sharper here than almost anywhere else in the country, because much of Frederick County is clay or clay loam. Clay holds water, swells when it is wet, shrinks when it dries, and a slab poured straight onto it rides that movement until it cracks across and tilts. The remedy is not a thicker slab. It is excavating deeper, replacing the top of the subgrade with compacted stone that drains, and grading so water leaves rather than collects. The parent page prices that honestly at an extra $2 – $5 per square foot rather than burying it.

The other thing a driveway quote should be specific about is the apron — the stretch between your garage and the public road. Where your property ends and the county or municipal right-of-way begins is a real line with real requirements attached, and work inside it generally needs permission from whoever maintains the road. Frederick County and the City of Frederick treat a new or widened apron differently from a patio in your back garden. We find out what applies before pouring rather than after.

Subgrade excavated and built for clay soil
Thickness and reinforcement matched to the loads
Control joints set out, not cut wherever

What concrete driveway costs in Maryland

Frederick-area residential driveways, installed, 2026. Carried from our concrete page. Removal of an existing drive, poor access and heavy grading are extra and get quoted after a site visit, as does anything inside the public right-of-way.

Concrete driveway
$8 – $18 per square foot
Subgrade prep on clay soil
+$2 – $5 per square foot
Typical two-car driveway, 600 sq ft
$5,400 – $13,800
Tear-out of existing slab
$3 – $8 per square foot
Apron and right-of-way transition
$1,200 – $3,800
Trench drain at a garage
$1,100 – $2,800

Ranges, not quotes. Real numbers come from a walkthrough — access, condition, height and finish level move a price more than square footage does. Estimates are free and in writing.

Get your numberFull concrete driveway cost guide for Maryland

Prefer to just talk?

Call and describe the job. You’ll get a straight answer on whether it’s something we do and roughly what it runs.

(301) 524-1729
Concrete driveways in progress — AS Home Solutions MD, Maryland

Self-performed

Concrete driveways

What’s included

Everything the concrete driveway scope actually covers.

Written into the estimate, not assumed. If something on your job is not on this list, it gets priced and named before anyone starts.

Excavation and subgrade built for clay

01

Topsoil and anything organic removed, the subgrade cut deeper than the slab needs on its own, and the top of it replaced with compacted stone that drains. On clay this is the whole ball game — it is why a Frederick driveway costs more than the same slab on sandy ground, and why skipping it shows up in about three winters.

Thickness and reinforcement for real loads

02

Slab thickness set by what will actually drive on it, with reinforcement — mesh or fibre, depending on the pour — specified rather than left out. A driveway that will see a delivery lorry or a heavy pickup is a different slab from one that sees two cars, and quoting them the same is how the ruts start.

Control joints set out deliberately

03

Concrete will crack; joints decide where. They get laid out to panel dimensions that suit the slab rather than cut wherever is convenient at the end, cut deep enough to actually govern, and placed at the re-entrant corners where a crack would otherwise start on its own. A driveway with joints in the wrong places cracks between them.

Pitch, and somewhere for water to go

04

A driveway is a large impervious surface usually pointed at a garage. Fall away from the building, a cross-fall or crown where the layout allows, and a plan for the water at the bottom — a trench drain across the apron where the grade leaves no alternative. Water standing against a garage slab gets underneath it.

Apron, right-of-way and permissions

05

The join to the public road detailed for the loads at the transition, and the permission question answered before work starts. The rule belongs to whoever maintains the road — the county, the city, or the state — and not to us. We tell you what we believe applies rather than discovering it halfway through.

Finish, cure and the honest timeline

06

Broom finish unless you have asked for something else, cured properly rather than left to dry, and a clear timeline: walk on it after about 24 to 48 hours, a car after about seven days, heavy vehicles not until the full 28-day cure is done. Driving on green concrete is the most common way a good pour gets damaged.

On the job

Concrete work across Frederick & Central MD.

What the trade looks like at each stage. Photos of our own recent jobs come out at the walkthrough, on the actual house.

Concrete driveways — AS Home Solutions MD, Maryland
Concrete driveways — AS Home Solutions MD, Maryland
Concrete driveways — AS Home Solutions MD, Maryland
Concrete driveways — AS Home Solutions MD, Maryland

Straight answers

Concrete driveway questions

Not covered here? Call and ask — you’ll get a real answer, not a “depends on the job”.

Thicker than a patio, and set by what will actually use it rather than by a rule of thumb. The decision is really two decisions together — thickness and reinforcement — and both are driven by the loads and by what the subgrade underneath is doing. A drive that regularly sees a heavy pickup or a delivery lorry needs more of both than one that sees two cars. We specify it on your site rather than quoting a default, and we will tell you when a cheaper quote has specified less.

Walk on it after about 24 to 48 hours, drive a car on it after about seven days, and keep heavy vehicles off for the full 28-day cure. Concrete reaches most of its strength in the first week but is still gaining for a month, and the damage done by parking a loaded truck on a five-day-old slab is permanent. We leave the drive protected and tell you the dates rather than leaving you to guess.

For the part on your own property, often not; for the apron and anything inside the public right-of-way, usually yes, and that permission comes from whoever maintains the road. Frederick County and the City of Frederick treat a new or widened apron differently from a back-garden patio, and impervious-surface limits can apply as well. Your county permit office is the authority, and we will say what we believe applies before work starts.

Same crew, same visit

The rest of the concrete work.

Most concrete jobs are two or three of these at once, which is why they are priced and scheduled together rather than as separate call-outs.

All concrete work

Talk to the people doing the work

Get a straight number for the whole job.

Tell us what needs doing. We’ll walk it with you, sequence every trade it touches, put the price in writing, and leave you to decide.

Get a quote

Let’s price your project.

Two short steps. No obligation, no pressure — just a clear number and a straight answer about what the job involves.

AS Home Solutions MD installer in a hard hat setting flooring on siteLaid straight, finished clean

Tick as many as you like. Most jobs are two or three of them at once, and I sort out the detail when I come and look. Nobody gets turned away for choosing the wrong box.

(301) 524-1729

Step 1 of 2

What do you need?

Pick as many as you need — we can sort the detail on the call.