A stair is the hardest trim in the house because nothing on it is square and everything on it is seen from below.
Quick answer
A scribed skirt board runs $450 to $1,100 per flight, tread and riser trim $55 to $160 per tread, and balusters $30 to $85 each fitted. Refixing a loose newel post back to the framing is $180 to $550 and handrail is $35 to $90 per linear foot supplied and fitted. Skirts are priced per flight because the scribing work does not scale neatly by the foot.
The work
Stair trim is finish carpentry at its least forgiving. The treads are not level, the risers are not equal, the wall is not plumb and the whole assembly is viewed from underneath where every gap is backlit. A stairwell is also the one place in a house where people are standing still, holding the rail, looking at the work from eighteen inches away.
The skirt board is the piece that makes or breaks it. It is the board running up the wall alongside the treads, and it has to be cut to follow the stair exactly — scribed to each tread and riser so the joint is tight all the way up. The shortcut is a straight board with the gaps filled, and it shows as a wavering caulk line for as long as the stair exists. Cut properly, the skirt is a single clean diagonal and the stair reads as one piece of joinery.
The other half is the balustrade, and here there is a rule rather than a preference. A sphere of four inches must not pass between balusters, and the spacing has to be set out so that it does not — which usually means calculating the baluster count per tread rather than eyeballing an even look. We also deal with newel fixing, which is the commonest thing we find wrong on an existing stair: a newel post that moves when you lean on it is doing none of its job, and it is nearly always fixed to the trim rather than to the framing.
Maryland stair trim, installed. Skirt boards are priced per flight because the scribing work does not scale by the foot. Structural stair alteration is not included and is not something we take on.
Ranges, not quotes. Real numbers come from a walkthrough — access, condition, height and finish level move a price more than square footage does. Estimates are free and in writing.
Get your numberFull stair trim cost guide for MarylandPrefer to just talk?
Call and describe the job. You’ll get a straight answer on whether it’s something we do and roughly what it runs.
(301) 524-1729
Self-performed
Stair trim and skirt boards
What’s included
Written into the estimate, not assumed. If something on your job is not on this list, it gets priced and named before anyone starts.
The skirt cut to follow every tread and riser so the joint closes along its whole length. This is slow work with a template and it is the single thing that distinguishes a stair that looks built from one that looks trimmed.
Treads and risers fitted and nosings returned at the open side with a mitred return rather than a square cut end, which is the detail the eye reads from the hall below. Squeaks dealt with from above where we can get at them.
Spacing calculated so a four-inch sphere cannot pass between balusters, which is the code requirement rather than a matter of taste, and set out so the result looks regular rather than merely compliant. Usually that means two balusters per tread.
Newels anchored back to the framing rather than to the trim, so the post does not move when the rail is leaned on. A loose newel is the most common defect we find on existing stairs and it is a safety item, not a cosmetic one.
Rail set at a consistent height above the nosing line with the returns at the top and bottom resolved, so there is something to hold onto for the full run. The CDC material below is a plain reminder of why that matters in a house with older occupants.
Nail holes filled, joints dressed, the skirt caulked to the wall and the stairwell left clean. Painted or stained by us in the same visit where you want it, which on a stair saves a second round of masking.
On the job
What the trade looks like at each stage. Photos of our own recent jobs come out at the walkthrough, on the actual house.




Straight answers
Not covered here? Call and ask — you’ll get a real answer, not a “depends on the job”.
Close enough that a four-inch sphere cannot pass between them, which is the code requirement and the reason most stairs end up with two balusters per tread. It is worth setting out properly rather than spacing by eye, because an even-looking stair that fails the four-inch test has to be redone and a compliant one set out badly looks irregular.
Almost always because it is fixed to the trim or the skirt rather than back to the framing underneath. It is the commonest defect we find on existing stairs and it is a safety issue rather than a cosmetic one, because the newel is what anchors the whole balustrade. It is usually fixable without rebuilding the stair, and we will tell you after we have looked underneath.
Often, and the honest answer depends on access. Where we can reach the treads from above during trim work, shimming and refixing the tread to the stringer solves most squeaks. Where the fix needs access from underneath and the stair is closed in, it becomes a bigger job. What we will not do is call a structural problem a squeak — if a stringer has moved, that is a different conversation.
Same crew, same visit
Most finish carpentry jobs are two or three of these at once, which is why they are priced and scheduled together rather than as separate call-outs.
From the field
Longer answers than a quote page has room for — how the work fails, what putting it right actually involves, and when waiting is the honest call.
Sources worth your time
None of these are ours. They are the offices and standards bodies that set the rules we work to, so you can verify what we say rather than take it.
Where the residential-construction standards and material research behind these decisions are published.
OpenThe injury data behind grab bars and curbless showers. Worth reading if you are deciding whether an accessible bathroom is premature.
OpenCheck any Maryland contractor's licence before you sign. Ours is on file with the Commission.
Open
Talk to the people doing the work
Tell us what needs doing. We’ll walk it with you, sequence every trade it touches, put the price in writing, and leave you to decide.
Get a quote
Two short steps. No obligation, no pressure — just a clear number and a straight answer about what the job involves.




Tick as many as you like. Most jobs are two or three of them at once, and I sort out the detail when I come and look. Nobody gets turned away for choosing the wrong box.